Pink Line (Delhi Metro)

The Pink Line (Line 7) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India.[1] It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi.

Pink Line
(Line 7)
Pink Line near Anand Vihar Station
Overview
StatusOperational
OwnerDelhi Metro
LocaleDelhi
Termini
Stations38
Service
TypeRapid Transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockHyundai-ROTEM
History
Opened
Technical
Line length59.24 km (36.81 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

under construction
Yamuna Vihar
Bhajanpura
Khajuri Khas
Sonia Vihar
Yamuna River
Soorghat
Jagatpur Village
Jharoda Majra
Burari
Outer Ring Road
Mukundpur Depot
Majlis Park
Ring Road
Azadpur
Shalimar Bagh
Netaji Subhash Place
Shakurpur
Rohtak Road
Punjabi Bagh West
ESI - Basaidarapur
Rajouri Garden
Najafgarh Road
Mayapuri
Naraina Vihar
Delhi Cantonment
Dhaula Kuan
Durgabai Deshmukh South Campus
Sir M. Vishweshwaraiah Moti Bagh
Bhikaji Cama Place
Sarojini Nagar
Dilli Haat - INA
South Extension
Lajpat Nagar
Vinobapuri
Ashram
Sarai Kale Khan - Nizamuddin
Hazrat Nizamuddin railway station Sarai Kale Khan Inter-State Bus Terminus
Ring Road
Yamuna River
Mayur Vihar-I
Mayur Vihar Pocket I
Trilokpuri Sanjay Lake
East Vinod Nagar - Mayur Vihar-II
Mandawali - West Vinod Nagar
IP Extension
Anand Vihar
Karkarduma
Karkarduma Court
Krishna Nagar
East Azad Nagar
Welcome
Grand Trunk Road
Jaffrabad
Maujpur - Babarpur
Gokulpuri
Johri Enclave
Shiv Vihar

At 59.24 kilometres (36.81 mi), the Pink Line is the longest individual line in the Delhi Metro and in India, exceeding the length of the operational Blue Line (excluding its branch line). It is mostly elevated and covers Delhi in an almost U-shaped pattern. The Pink Line is also known as the Ring Road Line, as the line passes alongside the Ring Road in Delhi.

The Pink Line has interchanges with most of the operational lines of the network, such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & Dilli Haat - INA, Green Line at Punjabi Bagh West, Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Airport Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBTs at Anand Vihar and Sarai Kale Khan.

The Pink Line has the highest point of the Delhi Metro at Dhaula Kuan with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[2] It also possesses the country's smallest metro station, Ashram, with a size of just 151.6 metres against the usual 265 metres.[3]: 93  Also, the platform for a six-coach train is 140 metres but has been reduced to 135 metres in the Ashram station.

The line will be extended to Maujpur - Babarpur, creating one of the world's longest ring lines in the city. The Maujpur - Babarpur to Shiv Vihar section will then act as a branch line. The extension is expected to be completed by March 2025.[4]

History

edit

The total length of the line is 59.24 kilometres (36.81 mi).[5] There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.

The line was opened in five stages from March 2018 to August 2021. The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, thereafter the section between Durgabai Deshmukh South Campus and Lajpat Nagar was opened on 6 August 2018, Shiv Vihar to Trilokpuri was opened on 31 October 2018. The section between Lajpat Nagar to Mayur Vihar Pocket I was opened on 31 December 2018.

The section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was not completed as construction of a 1.5 km (0.93 mi) viaduct began late due to land acquisition issues at Trilokpuri.[6] This had rendered the Pink Line into two independent lines. Trains from Majlis Park would terminate at Mayur Vihar Pocket 1, while trains coming from Shiv Vihar would terminate at either IP Extension or Trilokpuri Sanjay Lake.

The final section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was opened on 6 August 2021.[7]

Stations

edit

The stations of the Pink Line are:[8]

Pink Line
#Station NamePhaseOpeningInterchange ConnectionStation LayoutPlatform LayoutDepot ConnectionDepot Layout
EnglishHindi
1Maujpur - Babarpurमौजपुर - बाबरपुर42025

[9]

Pink LineElevatedSideNoneNone
2Yamuna Viharयमुना विहार42025NoneElevatedSideNoneNone
3Bhajanpuraभजनपुरा42025NoneElevatedSideNoneNone
4Khajuri Khasखजूरी ख़ास42025NoneElevatedSideNoneNone
5Sonia Viharसोनिया विहार42025NoneElevatedSideNoneNone
6Soorghatसूरघाट42025NoneElevatedSideNoneNone
7Jagatpur Villageजगतपुर गांव42025NoneElevatedSideNoneNone
8Jharoda Majraझड़ौदा माजरा42025NoneElevatedSideNoneNone
9Burariबुराड़ी42025NoneElevatedSideNoneNone
10Majlis Parkमजलिस पार्क314 March 2018Magenta Line
(Phase 4 - Under Construction)
ElevatedSideMukundpur DepotAt Grade
11Azadpurआज़ादपुर314 March 2018Yellow Line
Magenta Line
(Phase 4 - Under Construction)
UndergroundIslandNoneNone
12Shalimar Baghशालीमार बाग़314 March 2018NoneUndergroundIslandNoneNone
13Netaji Subhash Placeनेताजी सुभाष प्लेस314 March 2018Red LineUndergroundSideNoneNone
14Shakurpurशकूरपुर314 March 2018NoneElevatedIslandNoneNone
15Punjabi Bagh Westपंजाबी बाग़ पश्चिम314 March 2018Green Line
ElevatedSideNoneNone
16ESI - Basaidarapurईएसआई - बसईदारापुर314 March 2018NoneElevatedSideNoneNone
17Rajouri Gardenराजौरी गार्डन314 March 2018Blue LineElevatedSideNoneNone
18Mayapuriमायापुरी314 March 2018NoneElevatedSideNoneNone
19Naraina Viharनारायणा विहार314 March 2018NoneUndergroundIslandNoneNone
20Delhi Cantonmentदिल्ली छावनी314 March 2018NoneElevatedSideNoneNone
21Durgabai Deshmukh South Campusदुर्गाबाई देशमुख साउथ कैम्पस314 March 2018Airport ExpressElevatedSideNoneNone
22Sir M. Vishweshwaraiah Moti Baghसर एम. विश्वेश्वरय्या मोती बाग़36 August 2018NoneElevatedSideNoneNone
23Bhikaji Cama Placeभीकाजी कामा प्लेस36 August 2018NoneUndergroundIslandNoneNone
24Sarojini Nagarसरोजिनी नगर36 August 2018NoneUndergroundIslandNoneNone
25Dilli Haat - INAदिल्ली हाट - आईएनए36 August 2018Yellow LineUndergroundIslandNoneNone
26South Extensionसाउथ एक्सटेंशन36 August 2018NoneUndergroundIslandNoneNone
27Lajpat Nagarलाजपत नगर36 August 2018Violet Line
Golden Line
UndergroundIslandNoneNone
28Vinobapuriविनोबापुरी331 December 2018NoneUndergroundIslandNoneNone
29Ashramआश्रम331 December 2018NoneUndergroundIslandNoneNone
30Sarai Kale Khan - Nizamuddinसराय काले ख़ान - निज़ामुद्दीन331 December 2018 Sarai Kale Khan
Hazrat Nizamuddin railway station
Sarai Kale Khan ISBT
UndergroundIslandNoneNone
31Mayur Vihar-Iमयूर विहार-१331 December 2018Blue LineElevatedSideNoneNone
32Mayur Vihar Pocket Iमयूर विहार पॉकेट १331 December 2018NoneElevatedSideNoneNone
33Trilokpuri Sanjay Lakeत्रिलोकपुरी संजय झील331 October 2018NoneElevatedSideNoneNone
34East Vinod Nagar - Mayur Vihar-IIपूर्व विनोद नगर - मयूर विहार-२331 October 2018NoneElevatedSideNoneNone
35Mandawali - West Vinod Nagarमंडावली - वेस्ट विनोद नगर331 October 2018NoneElevatedSideNoneNone
36IP Extensionआईपी एक्सटेंशन331 October 2018NoneElevatedSideVinod Nagar - Ghazipur DepotAt Grade

Elevated

37Anand Viharआनंद विहार331 October 2018Blue Line
Anand Vihar
Anand Vihar Terminal railway station
Anand Vihar ISBT
ElevatedSideNoneNone
38Karkardumaकड़कड़डूमा331 October 2018Blue LineElevatedSideNoneNone
39Karkarduma Courtकड़कड़डूमा कोर्ट331 October 2018NoneElevatedSideNoneNone
40Krishna Nagarकृष्णा नगर331 October 2018NoneElevatedSideNoneNone
41East Azad Nagarआज़ाद नगर पूर्व331 October 2018NoneElevatedSideNoneNone
42Welcomeवेलकम331 October 2018Red LineElevatedSideNoneNone
43Jaffrabadजाफ़राबाद331 October 2018NoneElevatedSideNoneNone
44Maujpur - Babarpurमौजपुर - बाबरपुर331 October 2018Pink Line
(Phase 4 - Under Construction)
ElevatedSideNoneNone
45Gokulpuriगोकुलपुरी331 October 2018NoneElevatedSideNoneNone
46Johri Enclaveजौहरी एनक्लेव331 October 2018NoneElevatedSideNoneNone
47Shiv Viharशिव विहार331 October 2018NoneElevatedSideNoneNone

Train Info

edit
Pink Line
RakesHyundai RotemBEML
Train Length6
Train Gauge4 ft 8+12 in (1,435 mm) standard gauge
Electrification25 kV, 50 Hz AC through overhead catenary
OHE
Train's Maximum Speed100 km/h
Train OperationDelhi Metro

See also

edit

References

edit
  1. ^ "Metro comes to north-east Delhi, but it won't be straight line". Times of India. 30 October 2018.
  2. ^ "New high for Metro with track at 24m". The Indian Express. 26 September 2014.
  3. ^ Dayal, Anuj (5 April 2018). Delhi Metro - Phase 3 Challenges. New Delhi: Delhi Metro Rail Corporation.
  4. ^ "First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief". TimesNow. 5 November 2023. Retrieved 24 November 2023.
  5. ^ "Delhi Metro Map". www.delhimetrorail.com. Retrieved 6 August 2021.
  6. ^ Roy, Sidharatha (4 May 2018). "Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged". The Times of India. Retrieved 28 May 2019.
  7. ^ "Delhi Metro Pink Line's Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated". The Hindu. 6 August 2021. ISSN 0971-751X. Retrieved 6 August 2021.
  8. ^ "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation Ltd (DMR). February 2015. Retrieved 28 June 2015.
  9. ^ "First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief". TimesNow. 5 November 2023. Retrieved 24 November 2023.
edit