How to Build a Straight Form for Concrete

Download ArticleDownload Article

Building a straight form for concrete is fairly simple as long as the correct techniques are used. The depth and width of the concrete placement determine the bracing and forming material required. This article will refer to a slab form, wall forms have completely different requirements.

  1. How.com.vn English: Step 1 Lay out the corner positions of the slab using stakes and string lines.
    A builder's level is ideal for establishing the grade of the top of concrete,[1] but an inexpensive line level will give decent results on short spans.
  2. How.com.vn English: Step 2 Measure diagonally on...
    Measure diagonally on square and rectangular slabs from corner to corner, shifting parallel sides until the diagonal measurements are equal, while the lengths of the sides remain the desired widths. For simple shapes and small size slabs, this "working line" is sufficient, but for complex shapes and large critical layouts, "batter boards" should be used so that the established building lines will be available to recheck layout as forming progresses.
    Advertisement
  3. How.com.vn English: Step 3 Place the form...
    Place the form board starting at one corner alongside the string line, staking it down about 18 inch (0.3 cm) from the line with sharpened wood stakes. The thickness of the slab will determine the spacing of the stakes, as well as the nominal dimension of the forming lumber. As an example, a 1X4 pine board is usually stiff enough to support a 4 inch (10.2 cm) concrete placement (pour), where an 8 to 12 inch (20.3 to 30.5 cm) slab thickness will require 2 inch (5.1 cm) dimension lumber of a width equal to the height. To insure ease of forming, select straight, flat lumber with minimal knots at the lumberyard.[2]
  4. How.com.vn English: Step 4 Stake 4 inch...
    Stake 4 inch (10.2 cm) slabs a minimum of 32 inches (81.3 cm) on center, and deep enough to firmly support the form, depending on the stability of the soil beneath the form. For thicker slabs, decrease your stake spacing, a 12 inch (30.5 cm) slab will need to be staked no more than 24 inches (61.0 cm) on center. Nail the forms to the stakes level with and almost touching the string line.
  5. How.com.vn English: Step 5 Pack the soil...
    Pack the soil around the stakes to lean the form in or out if needed to align it with the string line, and if it is necessary, place a gauge block to hold the string clear of the form and gauge the form at frequent intervals to assure the form is straight.
  6. How.com.vn English: Step 6 Drive another row...
    Drive another row of stakes behind the form 2 to 3 feet (0.6 to 0.9 m) for thicker slabs, and nail a kicker, or 2x4 board from the offset stake to the side of the stake nailed to the form to keep it stable. When placing the concrete, you may want to restring each side to make sure the weight of the concrete hasn't bowed the form, and these stakes can be wedged out to correct any bows.[3]
  7. Advertisement

Community Q&A

Search
Add New Question
  • Question
    At what size do I need to use batter boards and how do I adjust them for four corner alignment without lessening their stability?
    How.com.vn English: Community Answer
    Community Answer
    It would be better to use metal spikes instead of batter boards. Nail them to the form boards and it will work well.
Ask a Question
200 characters left
Include your email address to get a message when this question is answered.
Submit
      Advertisement

      Video

      Tips

      • Check alignment of forms by eyeballing them, that is, bending down so that you can sight down the edge of the form.
      • The straighter the lumber you use to form, the easier it will be to align it.
      • Use a sledgehammer that fits you. 20 pound sledges are far too heavy for most people, an 8 pound is a common choice, and many people cut the handle down to 30 inches (76.2 cm) or less for better control.
      Show More Tips
      Submit a Tip
      All tip submissions are carefully reviewed before being published
      Thanks for submitting a tip for review!
      Advertisement

      Warnings

      • The only hazards normally encountered in this type of work are splinters,[4] missed blows with the hammer, and nails flying. In the workplace, safety requirements recommend gloves, long pants, boots, and safety glasses in this operation.
      Advertisement

      About This Article

      How.com.vn is a “wiki,” similar to Wikipedia, which means that many of our articles are co-written by multiple authors. To create this article, 13 people, some anonymous, worked to edit and improve it over time. This article has been viewed 323,717 times.
      177 votes - 79%
      Co-authors: 13
      Updated: April 16, 2024
      Views: 323,717
      Categories: Concrete
      Thanks to all authors for creating a page that has been read 323,717 times.

      Did this article help you?

      ⚠️ Disclaimer:

      Content from Wiki How English language website. Text is available under the Creative Commons Attribution-Share Alike License; additional terms may apply.
      Wiki How does not encourage the violation of any laws, and cannot be responsible for any violations of such laws, should you link to this domain, or use, reproduce, or republish the information contained herein.

      Notices:
      • - A few of these subjects are frequently censored by educational, governmental, corporate, parental and other filtering schemes.
      • - Some articles may contain names, images, artworks or descriptions of events that some cultures restrict access to
      • - Please note: Wiki How does not give you opinion about the law, or advice about medical. If you need specific advice (for example, medical, legal, financial or risk management), please seek a professional who is licensed or knowledgeable in that area.
      • - Readers should not judge the importance of topics based on their coverage on Wiki How, nor think a topic is important just because it is the subject of a Wiki article.

      Advertisement