Samuel Beckett-class offshore patrol vessel

The Samuel Beckett-class offshore patrol vessel is a class of offshore patrol vessels (OPV) ordered by the Irish Naval Service from October 2010. The first vessel is named Samuel Beckett and was commissioned in May 2014.[7] Construction on this first vessel commenced in November 2011,[8][9][10] A further three vessels were named James Joyce, William Butler Yeats and George Bernard Shaw, and delivered in 2015, 2016 and 2018 respectively.[7][11][12]

Samuel Beckett shortly after commissioning
Class overview
NameSamuel Beckett class
BuildersAppledore Shipbuilders
OperatorsRepublic of Ireland Irish Naval Service
Preceded byRóisín class
Cost71.9 million[1][2][3][4] per unit including main gun
In commissionAs of December 2018
Planned4
Completed4
Active4
General characteristics
TypeOffshore patrol vessel
Displacement2,256 tonnes
Length90 m (295 ft 3 in)
Beam14 m (45 ft 11 in)
Draught3.8 m (12 ft 6 in)[5]
PropulsionTwo Wärtsilä medium speed diesel engines (5,440 kW (7,300 hp) each)450 kW bow thruster
Speed
  • Baseline speed 23 knots (43 km/h; 26 mph)
  • Economical speed 15 knots (28 km/h; 17 mph)
Range6,000 nautical miles (11,000 km; 6,900 mi) at 15 knots (28 km/h; 17 mph)[6]
Endurance21 days
Boats & landing
craft carried
3 × 8 m (26 ft) RHIB
Capacity3 × 6.1 m (20 ft) sea container, 1 x 5 ton, 9.56 m (31.4 ft) crane aft
Complement44 + up to 10 trainees
Sensors and
processing systems
Fire control: Electro Optical
Armament
Aviation facilitiesUAV only[5]

Background and design edit

Vard Marine Inc. (formerly STX Marine) designed the vessels, which have features in common with an earlier design, the Róisín class, in service with the Irish Naval Service since 1999.

The 90-metre (300 ft) OPV vessels are designated PV90 by Babcock Marine and approximately 10 metres (33 ft) longer with an additional 0.6 metres (2 ft 0 in) in depth to the existing Róisín-class PV80 vessels.[citation needed] This was intended to increase both its capabilities and abilities in the rough waters of the North Atlantic. The PV90 ship is designed to carry a crew of 44 and have space for up to 10 trainees. The ships' published cruising speed is 16 knots (30 km/h; 18 mph), with a top speed of 23 knots (43 km/h; 26 mph).[13]

The New Zealand Navy uses an 85-metre (279 ft) version of the Vard Marine Inc. OPV design, referred to as the Protector-class offshore patrol vessel. This is a modified version of the older Irish Naval Service Róisín-class PV80 vessels - with helideck and hangar incorporated.[14]

The Samuel Beckett-class ships are designed to carry remotely operated submersibles and a decompression chamber for divers. This is intended to add enhanced capabilities to undertake search and rescue, search and recovery, undersea exploration, and increased sea area surveillance. The expanded deck area would also allow the Naval Service to potentially deploy unmanned aerial vehicles for the first time. Features also include Dynamic Positioning systems and "Power Take In Systems" to enable fuel savings, as the main engines can be shut down and power sourced from battery storage or a smaller more economical engine.[15]

The first new ship was commissioned on 17 May 2014 - to replace Emer which was decommissioned on 20 September 2013.

Planning and construction edit

Samuel Beckett under construction

In 2007 it was reported that the Defence Forces expected to spend in the region of €180m on replacements for the three existing vessels of the Emer class.

In July 2010 the then Irish Minister for Defence, Tony Killeen, announced that the Department of Defence and Naval Service would be entering into talks with UK shipbuilder Babcock Marine on two vessels worth €50m each, with an option for a third.

In October 2010 contracts were signed, and the 'cutting of steel' for the first ship occurred on 24 November 2011.[16]

On 19 May 2012, Irish Naval Service Flag Office Commodore Mark Mellett (subsequently Rear Admiral, DCOS Sp) attended the traditional keel-laying ceremony for the first of the 90 meter OPVs. While modular construction methods don't strictly involve keel-laying, the term is still considered an important milestone, as it signals the first stage of connecting each of the components together. The keel-laying ceremony took place in Babcock Marine's Appledore Shipbuilding Yard in Devon, UK.[17]

The delivery of the first of the vessels was set for 2014 with the second in 2015.[6][8][18][19] The fit-out of crew quarters and facilities on the first two 55-berth ships was contracted to Moss Marine of Southampton in a £4.5 million contract. Fitting out of the first ship began in March 2012 for completion in early 2014.[15][20][21]

The option on the third vessel was exercised following the commissioning of Samuel Beckett, and delivered in 2016.[22] Payment for the ships was planned to be extended over a number of years to 2017.[23] The cost of the first three ships, including the main armament, was €213 million.[24] While not overtly proposed under the original contract, the Irish government placed an order for a fourth vessel in June 2016,[25] in a contract worth €67 million.[26]

Systems edit

Onboard systems include Mercury IP communication systems from communications and broadcast equipment vendors Trilogy.[27] Each vessel is equipped with two such communications systems. The first uses VHF, UHF and HF marine radio channels on panels installed throughout the vessel.[28] The second system aims to connect users in pre-configured work groups using interfaces installed at work stations around each vessel.[28]

Names edit

William Butler Yeats in July 2016
George Bernard Shaw

The first two ships were named for Samuel Beckett and James Joyce, as disclosed in July 2013 by the then Minister for Defence Alan Shatter in Dáil Éireann.[29] This decision to name the ships after literary figures, seen as controversial in some quarters,[30][31] saw a break from the tradition of naming Irish Naval vessels after women in Irish mythology.

In July 2015, the then Minister for Defence Simon Coveney declared that the third vessel would be named after William Butler Yeats.[32] At the keel-laying ceremony for the fourth vessel, on 28 February 2017, then Minister of State at the Department of Defence Paul Kehoe announced that the vessel would be named after George Bernard Shaw.[33][34]

Ships edit

NamePennant numberBuilderLaid downFloated outCommissionedStatus
Samuel BeckettP61Babcock Marine Appledore19 May 20123 November 2013[35]17 May 2014Active in service
James JoyceP625 November 201323 November 2014[36]1 September 2015In reserve since August 2023
William Butler YeatsP6326 November 201410 March 2016[37]17 October 2016Active in service
George Bernard ShawP6428 February 20172 March 2018[38]30 April 2019[39]In reserve since August 2023

References edit