NTPC Limited

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

NTPC Limited
FormerlyNational Thermal Power Corporation
Company typeCentral Public Sector Undertaking
ISININE733E01010
IndustryElectricity
Founded7 November 1975; 48 years ago (1975-11-07)
Headquarters,
India[1]
Area served
India
Key people
Gurdeep Singh (Chairman & MD)[2]
ServicesElectricity generation and distribution
natural gas exploration, production, transportation and distribution
RevenueIncrease177,977 crore (US$22 billion) (2023)[3]
Increase23,551 crore (US$2.9 billion) (2023)[3]
Increase 17,121 crore (US$2.1 billion) (2023)[3]
Total assetsIncrease 446,021 crore (US$56 billion) (2023)[3]
Total equityIncrease 150,954 crore (US$19 billion) (2023)[3]
OwnerMinistry of Power, Government of India[4]
Number of employees
15,786 (2022[3])
Subsidiaries
Websitewww.ntpc.co.in

It is the largest power company in India with an electric power generating capacity of 71,594 MW.[5] Although the company has approximately 16% of the total national capacity, it contributes to over 25% of total power generation due to its focus on operating its power plants at higher efficiency levels (approximately 80.2% against the national PLF rate of 64.5%). NTPC currently produces 25 billion units of electricity per month.[citation needed]

NTPC currently operates 55 power stations: 24 coal, seven combined cycle gas and liquid fuel, two hydro powered, one wind turbine, and 11 solar projects. Additionally, it has 9 coal and 1 gas station, owned by joint ventures or subsidiaries.

It was founded by Government of India in 1975, which now holds 51.1% of its equity shares[6] after divestment of its stake in 2004, 2010, 2013, 2014, 2016, and 2017. In May 2010, NTPC was conferred Maharatna status by the Union Government of India, one of only four companies to be awarded this status.[7] It is ranked 433th in the Forbes Global 2000 for 2023.[8]

History edit

1975–1994 edit

The company was founded on 7 November 1975 by India's former Prime Minister Indira Gandhi as National Thermal Power Corporation Private Limited. It started working on its first thermal power project in 1976 at Shaktinagar—named National Thermal Power Corporation Private Limited Singrauli—in Uttar Pradesh.[9] In the same year, its name was changed to "National Thermal Power Corporation Limited". In 1983, NTPC began commercial operations and earned profits of INR 4.5 crores in FY 1982–83. By the end of 1985, it had achieved power generation capacity of 2000 MW.
In 1986, it completed synchronisation of its first 500 MW unit at Singrauli. In 1988, it commissioned two 500 MW units, one each in Rihand and Ramagundam. In 1989, it started a consultancy division. In 1992, it acquired Feroze Gandhi Unchahar Thermal Power Station from Uttar Pradesh Rajya Vidyut Utpadan Nigam of Uttar Pradesh.[10] By the end of 1994, its installed capacity crossed 15,000 MW.

1995–2004 edit

In 1995, it took over the Talcher Thermal Power Station from Orissa State Electricity Board.[9] In the year 1997, the Government of India conferred it with "Navratna" status. In that same year, it achieved a milestone of generating 100 billion units of electricity in a single year.[9] In 1998, it commissioned its first Naptha-based plant at Kayamkulam with a capacity of 350 MW. In 1999, its plant in Dadri, which had the highest plant load factor (PLF) in India of 96%, was certified with ISO-14001. During 2000, it started construction of its first hydro-electric power project, with 800 MW capacity, in Himachal Pradesh.[9]
In 2002, it incorporated 3 subsidiary companies: NTPC Electric Supply Company Limited for forward integration by entering into the business of distribution and trading of power; NTPC Vidyut Vyapar Nigam Limited for meeting the expected rise in energy trading; and NTPC Hydro Limited to carry out the business of implementing and operating small and medium hydropower projects.[11] Later in 2002, its installed capacity crossed 20,000 MW.[9]

NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed the first day of listing with ₹75.55 per share.[12] On the day of listing, it became the third largest company in India in terms of market capitalisation.[13]

2005–present edit

In October 2005, the company's name was changed from National Thermal Power Corporation Limited to NTPC Limited. The primary reason for this change was the company's foray into hydro and nuclear based power generation along with backward integration of coal mining. In 2006, it entered into an agreement with the Government of Sri Lanka to set up two units of 250 MW each in Trincomalee in Sri Lanka.[9] During 2008 and 2011, NTPC entered into joint ventures with BHEL, Bharat Forge, NHPC, Coal India, SAIL, NMDC, and NPCIL to expand its business of power generation.[9][10] By the end of 2010, its installed capacity crossed 31,000 MW.[9]

The company in 2009 joined forces with other state enterprises Rashtriya Ispat Nigam, Steel Authority of India, Coal India, and National Minerals Development Corporation to invest in coal mining operations through a joint venture vehicle named International Coal Ventures Private Limited (ICVL). In July 2014, ICVL acquired a 65 percent stake in the Benga coal mine in Mozambique from the Rio Tinto Group.[14] In December 2022, the Market cap of NTPC limited was Rs. 1,66,249.34 crore.[15]

Operations edit

NTPC operates from 70 locations in India, one location in Sri Lanka and two locations in Bangladesh. In India, it has eight regional headquarters (HQ):

Sr. No.HeadquartersCity
1NCRHQDelhi
2ER-I HQPatna
3ER-II HQBhubaneshwar
4NRHQLucknow
5SRHQSecunderabad
6WR-I HQMumbai
7WR-II HQRaipur
8Hydro HQDelhi

Scheduling and generation dispatch edit

The scheduling and dispatch of all the generating stations owned by National Thermal Power Corporation are done by respective regional load dispatch centers, which are the apex body to ensure integrated operation of the power system grid in the respective region. All these load dispatch centers come under Power System Operation Corporation Limited (POSOCO).

Subsidiaries edit

  1. Convergence Energy Services Limited
  2. Energy Efficiency Services Limited
  3. NTPC Green Energy
  4. NTPC Renewables Limited
  5. National High Power Test Laboratory Private Limited(NHPTL)
  6. NEEPCO
  7. THDC India Limited

Capacity of plants edit

The total installed capacity of the company is 72,304 MW (including 13,465 MW through JVs/Subsidiaries) across the country, (26 Coal based stations, seven gas based stations, one hydro station, one small hydro, 11 Solar PV, and one wind based Station) and 25 Joint Venture stations (nine coal based, four gas based, eight hydro-powered, one small hydro, two wind-powered, and one Solar PV).

Thermal Power edit

Coal-based power plants (Own Operational) edit

Sr. No.ProjectStateCapacity in MWUnits in MWStatus
1Singrauli Super Thermal Power StationUttar Pradesh2,0005x200, 2x500All units functional
2NTPC KorbaChhattisgarh2,6003x200, 4x500All units functional
3NTPC RamagundamTelangana2,6003x200, 4x500All units functional.
4.Farakka Super Thermal Power StationWest Bengal2,1003x200, 3x500All units functional
5Vindhyachal Super Thermal Power StationMadhya Pradesh4,7836x210, 7x500, 2x4, 1x15All units functional. Largest Thermal Power Station in India. A small hydro of 8 MW and a PV Solar power station of 15 MW is also present.
6Rihand Thermal Power StationUttar Pradesh3,0006x500All units functional
7Kahalgaon Super Thermal Power StationBihar2,3404x210, 3x500All units functional
8NTPC DadriUttar Pradesh1,8204x210, 2x490All units functional
9Talcher Super Thermal Power StationOdisha3,0106x500, 1x10All units functional
10Feroze Gandhi Unchahar Thermal Power StationUttar Pradesh1,5505x210, 1×500All units functional
11Talcher Thermal Power StationOdisha4602x110, 4x60All units retired and shut down, will be replaced by 2x660 MW Unit[16]
12Simhadri Super Thermal Power StationAndhra Pradesh2,0004x500All units functional
13Tanda Thermal Power StationUttar Pradesh1,7604x110, 2×660All units functional
14Sipat Thermal Power StationChhattisgarh2,9802x500, 3x660All units functional
15Mauda Super Thermal Power StationMaharashtra2,3202x500, 2x660All units functional
16Barh Super Thermal Power StationBihar3,3003×660, 2x660All units functional
17Kudgi Super Thermal Power StationKarnataka2,4003x800All units functional
18NTPC BongaigaonAssam7503x250All units functional
19LARA Super Thermal Power StationChhattisgarh16002x800, 2x8002x800 MW unit functional, 2x800 MW unit under construction.
20Solapur Super Thermal Power StationMaharashtra1,3202x660All units functional.
21Gadarwara Super Thermal Power StationMadhya Pradesh3,2002×800, 2×8002x800 MW unit functional, 2x800 MW unit under construction
22North Karanpura Thermal Power StationJharkhand1,9803×660Under Construction
23Darlipali Super Thermal Power StationOdisha1,6002×8001x800 MW unit functional, 1x800 MW unit under construction.
24Khargone Super Thermal Power StationMadhya Pradesh1,3202×660All unit functional.
25Telangana Super Thermal Power ProjectTelangana1,6002×800Under construction[17]
26Barauni Thermal Power StationBihar7202×110, 2×250All units functional[18][19]

Coal-based (JV/Subsidiary) edit

Sr. No.Name of the JVLocationStateCapacity in MW
1NSPCL. Joint venture with SAIL.DurgapurWest Bengal160
2NSPCL. Joint venture with SAIL.RourkelaOdisha370
3NSPCL. Joint venture with SAIL.BhilaiChhattisgarh574
4NPGC. Wholly owned subsidiary of NTPC.AurangabadBihar1980
5Muzaffarpur Thermal Power Station (MTPS). Wholly owned subsidiary of NTPC.KantiBihar610
6BRBCL Joint venture with Indian Railways.NabinagarBihar1000
7Aravali Power CPL JV with HPGCL & IPGCLJhajjarHaryana1500
8NTECL JV with NTPC & TNEBChennaiTamil Nadu1500
9Meja Thermal Power Station JV with NTPC & UPRVUNLPrayagrajUttar Pradesh1320
10PUVNL(Patratu) Joint venture with Jharkhand State Electricity Board.PatratuJharkhand4000
11Khurja-THDCBulandshahrUttar Pradesh1320

Gas-based power plants (Own Operational) edit

Sr.No.Power projectStateCapacity MWUnit Size MWStatus
1AntaRajasthan419.333×88, 1×149All unit Running
2AuraiyaUttar Pradesh663.364×110, 2×106All unit Running
3KawasGujarat656.202×110.5, 4×106All unit Running
4DadriUttar Pradesh829.784×130.19,2×154.51All unit Running
5Jhanor-GandharGujarat657.393×131, 1×155All unit Running
6Kayamkulam, HaripadKerala359.582x115.2 + 1x129.177All unit Running
7FaridabadHaryana431.592×143, 1×144All unit Running

Gas-based (JV/Subsidiary) edit

Sr.No.Power projectStateCapacity MW
1Ratnagiri Gas and Power Private Limited (RGPPL)Maharashtra1967
2Assam Gas based power plantAssam291
3Agartala GT CCPPTripura135
4Tripura Gas based CCPPTripura101

Hydro Power edit

The company has also stepped up its hydroelectric power (hydel) project implementation. Some of these projects are:

Hydro-electric power plants (Own operational) edit

Sr.No.Power projectStateCapacity MWUnit in MWStatus
1Koldam DamHimachal Pradesh8004X200 MWAll Four Units Commissioned
2Tapovan VishnugadUttarakhand5204X130 MWUnder Construction
3Lata TapovanUttarakhand1713 x 57 MWUnder Construction
4Rammam HydroWest Bengal1203 x 40 MWUnder Construction

Hydro-electric power plants (JV/Subsidiary) edit

Sr.No.ProjectState/UTCapacity MW
1Tehri HPP (THDC)Uttarakhand1000
2Tehri PSP (THDC)Uttarakhand1000
3Koteshwar HPP (THDC)Uttarakhand400
4Vishnugad Pipalkoti HEP(THDC)Uttarakhand444
5Ranganadi HEP (NEEPCO)Arunachal405
6Doyang HEP (NEEPCO)Nagaland75
7Pare HEP (NEEPCO)Arunachal110
8Tuirial HEP (NEEPCO)Mizoram60
9Kopili HEP (NEEPCO)Assam275
10Kameng HEP (NEEPCO)Arunachal600

Renewable Energy edit

NTPC's current renewable power plants in solar and wind include:

Solar photovoltaic power plants (Own Operational) edit

Sr.No.ProjectState/UTCapacity
1Dadri Solar PVUttar Pradesh05 MW
2Port Blair Solar PVAndaman & Nicobar Island05 MW
3Ramagundam Solar PVTelangana110 MW
4Talcher KanihaOdisha10 MW
5Faridabad Solar PVHaryana05 MW
6Unchahar Solar PVUttar Pradesh10 MW
7Rajgarh Solar PVMadhya Pradesh50 MW
8Singrauli Solar PVUttar Pradesh15 MW
9Ananthpuram Solar PVAndhra Pradesh250 MW
10Bhadla-Solar PVRajasthan260 MW
11Mandsaur-Solar PVMadhya Pradesh250 MW
12Bishrampur Solar PVChhattisgarh20 MW
13Bhatgaon Solar PVChhattisgarh20 MW
14Fatehgarh Solar PVRajasthan296 MW
15Simhadri Floating SolarAndhra Pradesh25 MW
Total1351 MW

Solar photovoltaic power plants (JV/Subsidiary) edit

Sr.No.ProjectState/UTCapacity
1Solar TGBPP Tripura (NEEPCO)Tripura05 MW

Wind Power (Own Operational) edit

Sr.No.ProjectState/UTCapacity
1RojmalGujarat50 MW

Wind Power (JV/Subsidiary) edit

Sr.No.ProjectState/UTCapacity
1Patan Wind Power Project(THDC)Gujarat50 MW
2Devbhumi Dwarka Wind Power Project(THDC)Gujarat63 MW

Small Hydro edit

Future goals edit

The company has developed a long-term plan to become a 128,000 MW company by 2032. NTPC Limited is on an expansion spree to meet the power requirements of the country—the company has targeted to add 14,058 MW in 12th Plan (from FY13 to FY 17) of which it had already added 4,170 MW in 2012–2013, 1835 MW in 2013–2014, 1290 MW in 2014–2015, and 1150 MW from April–30 November 2015.

As of 30 November 2015, the company has 23,004 MW under construction. NTPC is diversifying its capacity mix with much emphasis on renewable energy. As on 30 November 2015, NTPC has 110 MW Solar PV capacity under operation, 250 MW under construction, and 1260 MW under tendering. The company intends to add 10000 MW of Solar PV capacity in the next five years. On 18 July 2015, NTPC declared commercial its first Hydro Power plant at Koldam in the state of Himachal Pradesh. The company has a long-term plan to reduce its fossil fuel capacity mix to 56% by 2032.

NTPC also plans to go global. The public sector company has signed a memorandum of agreement (MoU) with the Government of Sri Lanka and Ceylon Electricity Board for setting up a 500 MW (2x250) coal-based thermal power plant in the island nation. An MoU has also been signed with Kyushu Electric Power Co. Inc., Japan, for establishing an alliance for exchange of information and experts from different areas of the business. The company is also in the process of finalizing an MoU with Nigeria for setting up power plants against the allocation of LNG on a long-term basis for NTPC plants in India. NTPC is also developing a joint-venture coal-based power plant 1,320 MW (2x660) with the Bangladesh Power Development Board known as Bangladesh India Friendship Power Company in Rampal, Bangladesh, which is facing tremendous opposition from the people of Bangladesh owing to the plant's dangerously close proximity to the Sundarbans.[20]

NTPC has also been allotted coal blocks, namely Pakri Barwadih, Chatti Bariatu, and Kerandari in Jharkhand as well as Talipalli, Chhattisgarh, and Dulanga in Odisha. Except for Pakri Barwadih, all other blocks were canceled by a decision of the Supreme Court of India on 24 September 2014. However, the company was again allotted canceled block under Section 5 of Coal Mines (Special Provision Act 2015)[21] Besides these blocks, the Ministry of Coal has according to its press release dated 3 July 2013 allotted four more blocks namely, Banai and Bhalmuda in Chhattisgarh, Chandrabila and Kudanli Laburi in Odisha. Two more blocks namely Mandakini-II and Banhardih are expected to be allotted to NTPC soon. All these mines are having estimated geological reserves of 6.7 billion tonnes. NTPC has appointed Mining Cum Development Operator (MDO) for its Pakri Barwadih mine.[22]

Listings and shareholding edit

The equity shares of NTPC are listed on the Bombay Stock Exchange,[23] where it is a constituent of the BSE SENSEX index,[24] and the National Stock Exchange of India,[25] where it is a constituent of the S&P CNX Nifty.[26]

In September 2015, the Government of India held around 74.96% equity shares in NTPC. Over 680,000 individual shareholders hold approx. 1.92% of its shares. Life Insurance Corporation of India is the largest non-promoter shareholder in the company with 10.03% shareholding.[27]

In August 2017, the GOI divested further its 5% stake in NTPC through OFS (Stock Exchange Mechanism) and reduced the holding of GOI in NTPC to 5,76,83,41,760 shares i.e. 64.96% out of total 8,24,54,64,400 shares.

The balance is held by public, FIIs, Mutual Funds, and Banks.

ShareholdersShareholding[6][28]
Promoters: Government of India51.10%
DII18.20%
Foreign Institutional Investors14.54%
Body Corporate & Insurance Companies12.88%
Individuals/HUFs2.20%
Others1.08%
Total100.0%

Employees edit

As of 31 March 2015, the company had 24,067 employees. The attrition rate for the FY 2014–2015, including the trainee employees and employees working for subsidiaries and JVs, was 1.35%. Man MW Ratio of the company has fallen from 0.77 in the FY11 to 0.61 in FY 15. NTPC has been awarded continuously as great places to work for in PSUs category.

NTPC was ranked second among the 250 largest power producer energy traders in the world by Platts in 2015. On overall basis NTPC ranked 56th amongst Platts 250 companies.[29] In 2009, it received ICSI National Award for Excellence in Corporate Governance.[30]

Criticism edit

Land acquisition in tribal areas edit

The company (and other PSUs in India) has been allotted land for setting power plants and related infrastructure in rural or tribal areas across the country by Central Government and various state governments. Some of these lands have been allotted to NTPC (and other PSUs in India) through Land Acquisition Acts passed by Central and State Governments. Wherever a land acquisition law is enacted, it also places a liability on the PSUs or governments to take actions for proper rehabilitation of displaced residents of that rural or tribal area. Governments or PSUs are criticized if they do not fulfill their liability towards displaced residents. In many areas where land acquisition is proposed through land acquisition laws, local residents oppose the forcible acquisition, as they are not sure of proper rehabilitation.

Future growth edit

Draft National Electricity Plan (2016), prepared by GoI, states that India does not need additional coal-fired power plants until 2027 with the commissioning of various coal-based power plants which are presently under construction.[31] India is not facing regular power shortages to purchase electricity at high prices, offering higher profit margins to the competing power generating companies. With the help of assured power purchase agreements (PPA) from the state-owned DisComs, NTPC was able to sell its power at higher margins on the deployed capital and higher overhead costs. Moreover, its main expertise of generating power from coal-fired stations is becoming obsolete in terms of technology and economics against non-conventional power generation like wind, solar, etc.[32] In the future, for the satisfactory growth mainly from wind and solar power projects, NTPC is ready to slash all its extra profit margins on capital deployed to bring down the power sale price at par with the IPPs to secure the projects in open competitive bidding.

Government has decided to scrap the coal fired power stations which are more than 25 years old to reduce the pollution.[33] Instead of scrapping old pulverised coal fired units, NTPC should replace coal with torrefied crops waste/biomass as fuel in these units (nearly 11,000 MW) to make them profitable and productive assets without contributing to pollution.[34]

To utilize its proven O&M expertise, NTPC may venture on a major scale to implement the solar thermal storage power as they can offer clean and cheaper electricity than fossil fuel-fired power generation plants.[35]

Rather than install emissions-cutting technologies, NTPC has chosen to lobby the government to extend pollution reduction deadlines.[36]

Controversies with projects edit

Loharinag Pala Hydro Power Project by NTPC Ltd: Loharinag Pala Hydro Power Project (600 MW i.e. 150 MW × 4 units) is located on the river Bhagirathi (a tributary of the Ganges) in Uttarkashi district of Uttarakhand state. This is the first project downstream from the origin of the Ganges at Gangotri. The project was at the advanced stage of construction when it was discontinued by the Government of India in August 2010.

Rupasiyabagar Khasiabara HPP, 261 MW in Pithoragarh, Uttarakhand State, near China Border, is yet to be given investment approval..

Badarpur Thermal Power Station has been permanently closed due to pollution issues in Delhi NCR. The total installed capacity of all of its units was 705 MW, which has been retired and fully closed since 15 October 2018.[37][38]

See also edit

References edit

  1. ^ "Contact Us - NTPC". ntpc.co.in.
  2. ^ "Board of Directors - NTPC". ntpc.co.in.
  3. ^ a b c d e f "NTPC Limited" (PDF). www.bseindia.com. Archived from the original (PDF) on 19 May 2023.
  4. ^ "NTPC says Govt pares stake to 51.02%". Business Standard India. 5 March 2020. Retrieved 5 July 2022.
  5. ^ "Installed Capacity - NTPC".
  6. ^ a b "Shareholding Pattern - NTPC". ntpc.co.in.
  7. ^ "4 PSUs get maharatna status – Indian Express". 21 May 2010. Retrieved 17 August 2012.
  8. ^ "NTPC Limited". Forbes. Retrieved 17 February 2015.
  9. ^ a b c d e f g h "History of NTPC". NTPC Limited. Retrieved 12 October 2013.
  10. ^ a b "Company History - NTPC Ltd". The Economic Times. Retrieved 12 October 2013.
  11. ^ "Chairman's statement in 27th Annual Report" (PDF). NTPC. 24 September 2003. Archived from the original (PDF) on 14 October 2013. Retrieved 12 October 2013.
  12. ^ "NTPC does a power listing". The Times of India. 5 November 2004. Archived from the original on 15 October 2013. Retrieved 12 October 2013.
  13. ^ "Power major NTPC lists at premium". The Hindu. 6 November 2004. Archived from the original on 19 November 2004. Retrieved 12 October 2013.
  14. ^ "Indian JV to acquire Rio Tinto's Riversdale coal assets in Mozambique". India Gazette. Archived from the original on 10 August 2014. Retrieved 31 July 2014.
  15. ^ "Top 100 stocks by Market Capitalization | BSE Listed stocks Market Capitalization". www.bseindia.com. Retrieved 19 December 2022.
  16. ^ "Talcher thermal power plant shuts down, NTPC says modern unit will replace it".
  17. ^ "Future Capacity Additions - NTPC". ntpc.co.in.
  18. ^ "NTPC acquires 720 Mw Barauni thermal power plant in Bihar - ET EnergyWorld".
  19. ^ "NTPC acquires Barauni Thermal Power Station".
  20. ^ "' A power plant like Rampal would never be allowed in India' - Dhaka Tribune". dhakatribune.com. 23 August 2016.
  21. ^ 5618GI1.p65
  22. ^ Thriveni-Sainik appointed as MDO for NTPC's Pakri-Barwadih coal block of Jharkhand * Coal Power Steel
  23. ^ "NTPC LTD". BSEindia.com. Retrieved 12 October 2013.
  24. ^ "Scripwise Weightages in S&P BSE SENSEX". BSE India. Retrieved 11 October 2013.
  25. ^ "NTPC Limited". NSE India. Retrieved 11 October 2013.
  26. ^ "Download List of CNX Nifty stocks (.csv)". NSE India. Retrieved 12 October 2013.
  27. ^ "Archived copy". Archived from the original on 4 March 2016. Retrieved 7 December 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  28. ^ "Shareholding Pattern - NTPC". ntpc.co.in.
  29. ^ "Platts Top 250 Rankings". top250.platts.com.
  30. ^ "ICSI National Awards for Excellence in Corporate Governance for 2009". ICSI. 21 December 2009. Retrieved 12 October 2013.
  31. ^ "Draft National Electricity Plan, 2016, CEA" (PDF). Retrieved 11 December 2016.
  32. ^ "NTPC may drop further expansion plans of Kudgi thermal project in Karnataka". The Economic Times. Retrieved 28 March 2016.
  33. ^ "NTPC to phase out 11000 MW old power plants in five years - Piyush Goyal". Retrieved 26 February 2017.
  34. ^ "Overview of Wood Pellet Co-firing" (PDF). Archived from the original (PDF) on 27 February 2017. Retrieved 26 February 2017.
  35. ^ "Dispatchable Concentrated Solar Power Broke Price Records in 2017". Retrieved 22 September 2017.
  36. ^ Varadhan, Sudarshan (19 December 2019). "Exclusive: India's NTPC snubs foreign emissions tech, shuts out GE, others from $2 billion orders". Reuters.
  37. ^ "Badarpur power plant shut, action plan to tackle air pollution in Delhi-NCR comes into force". 16 October 2018.
  38. ^ "Badarpur thermal plant,Delhi's biggest power generator, to shut down from October 15". 5 October 2018.