Panauti Hydropower Station

(Redirected from Khopasi Hydro Power)

Panauti Hydropower Station (also called Khopasi Hydropower Station) is the third hydropower station which was constructed in Nepal, in 1965.[1] It is the first megawatt (MW) capacity hydropower station in Nepal.[clarification needed]

Panauti Hydropower Station
Panauti Hydropower Station is located in Nepal
Panauti Hydropower Station
Location of Panauti Hydropower Station in Nepal
Official namePanauti Hydropower Station
CountryNepal
LocationKavre District
Coordinates27°33′47″N 85°32′10″E / 27.56308°N 85.53604°E / 27.56308; 85.53604
PurposePower
StatusOperational
Owner(s)Nepal Electricity Authority
TypeRun-of-the-river
Installed capacity2.4 MW

It is a run-of-the-river hydroelectric plant on the Roshi Khola river. This power station is located at Khopasi, Kavre district, 35 km east of Kathmandu and 7 km south-east from Panauti Bazar.

It was built in 1965 with the assistance from then SovietUnion at a cost of NRs 27 million. It has a capacity of 2.4 MW, from 3 units of 0.8 MW each and annual design generation of 6.97 GWh. The Projectwas designed for operation of only two units at atime with third unit as a standby. Open canal of3,721 m long with discharge of 3.2 cu. m/s fromheadwork to reservoir has seven (7) outlet gatesfor irrigation in the vicinity of Khopasi.

After the major improvement activities accomplished in2018/019 ( Rehabilitation and Modernizationof Switchyards of Panauti Hydropower Stationlocated at Khopasi and Bhakatpur ), Panauti Hydropower Station isgenerating maximum annual energy (in 2018/19) which thepower plant had not been able to do since the last11 years.[2]

Hydropower namePanauti Hydropower Station
Commissioned year1965
TypeRun of River
LocationPanauti Municipality–12, Khopasi
Installed capacity2.4 MW
Annual average energy6.97 GWh
Maximum Net head Catchment area66m /60m
Average annual flow3.2m^3/s
Live storage volume Dam50,000 m3
Total length of the waterways3.721 km
Penstock turbine1 No., 370m long, 1.4m
Numbers of Turbine /type3/ Horizontal Francis
Rated discharge/ Turbine1.61m3/s
Rated output / Turbine0.85MW
Rated speed1000 rpm
Generator Rated output1000 kVA
Rated voltage6.3 kV
Rated frequency50 Hz
Power factor0.8
Power transformer1550 kVA, 6.3 kV/33 kV, 3 phase, 2 Nos.
Transmission line33kV, 20 km, single circuit

[3]

References edit

  1. ^ Raj Rai, Kumbha; Prasad Bhatta, Tika; Baral, Prakash (7 October 2022). "Micro hydros face doubtful future as national grid reaches rural homes". Kathmandu Post.
  2. ^ NEA, NEA. "NEA 2018/19 report" (PDF). NEA. Retrieved 18 June 2020.
  3. ^ NEA, NEA. "Panauti Hydropower Station". NEA. Retrieved 18 June 2020.