Blue Line (Chennai Metro)

The Blue Line is one of the two operational lines of Chennai Metro apart from the Green line. The line stretches from Chennai Airport to Wimco Nagar Depot, covering a distance of 32.65 km (20.29 mi). The line consists of 26 stations out of which 13 stations are underground and the rest are elevated or on ground level. In May 2018, operations on the blue line commenced between Saidapet and AG-DMS with the extended underground stretch from AG-DMS to Washermanpet of blue line commencing operations on 10 February 2019 completing the phase 1 of the metro.

Blue Line (Line 1)
Chennai Metro Blue Line
Overview
Native nameநீல வழித்தடம்
StatusIn operation
OwnerCMRL
Termini
Stations38
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
History
Opened21 September 2016
Technical
Line length32.65 km (20.29 mi)
Number of tracks2
Character17 km Underground and 15.65 km Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
Route map

Wimco Nagar Depot
Wimco Nagar Depot
Wimco Nagar
Tiruvottriyur
Thiruvottriyur Theradi
Kaladipet
Toll Gate
New Washermanpet
Tondiarpet
Sir Theagaraya College
Washermanpet
Mannadi
High Court
M.G.R Central
Green Line
Government Estate
LIC
Thousand Lights Purple Line
AG – DMS
Teynampet
Nandanam Orange Line
Saidapet
Little Mount
Guindy
Arignar Anna Alandur
Nanganallur Road
Meenambakkam
Chennai International Airport Chennai International Airport
Pallavaram
Kothandam Nagar
Chromepet Bus interchange
Mahalakshmi Colony
Thiru.Vi.Ka Nagar
Tambaram Bus interchange
Irumbuliyur
Peerkankaranai
Perungalathur
Vandalur
Arignar Anna Zoological Park
Kilambakkam Bus interchange

Map


Planning and construction

edit

Phase I

edit

In 2006, a modern metro rail system was planned for Chennai modeled after the Delhi Metro.[1][2] Delhi Metro Rail Corporation (DMRC) was tasked with preparing a detailed project report on the implementation of metro system in Chennai.[2] Based on the report, the Government of Tamil Nadu approved the first phase of the project in November 2007.[3] The first phase was planned with two lines covering 45.1 km (28.0 mi) with 25 km (16 mi) being underground. The first corridor would connect Washermanpet with Chennai International Airport extending for 23.1 km (14.4 mi) with 14.3 km (8.9 mi) being underground.[2] In December 2007, Chennai Metro Rail Limited (CMRL) was incorporated and the Government of India gave approval for the project in January 2009.[4][3]

The construction started in June 2009.[5] In August 2010, the contract for supplying rolling stock was awarded to Alstom.[6][7] Test and trial runs happened on the Green line in 2013 and early 2014.[8][9][10] After approvals from RDSO and the Commissioner of Metro Rail Safety, commercial operations started between Alandur and Koyambedu stations on the green line in June 2015.[11][12][13] On 21 September 2016, commercial operations commenced between Airport and Little Mount on the blue line.[14] In May 2018, the blue line was extended between Saidapet and AG-DMS.[15] On 10 February 2019, the underground stretch from AG-DMS to Washermanpet of blue line was opened, completing the first phase of the metro.[16]

Line NameTerminalsStationsOpened
Blue LineChennai AirportLittle Mount621 September 2016
Little MountAG–DMS425 May 2018
AG–DMSWashermanpet710 February 2019

Phase 1 Extension

edit

A 9 kilometres (5.59 mi) northern extension of the blue line running from Washermanpet to Wimco Nagar consisting of nine stations.[17][18] Construction started in July 2016 with trial runs in December 2020.[19][20] The line opened for passenger traffic on 14 February 2021, increasing the length of the operational metro system to 54.1 km (33.62 mi).[21]

Line NameTerminalsStationsOpened
Blue LineWashermanpetWimco Nagar814 February 2021
Wimco NagarWimco Nagar Depot113 March 2022

Future plans

edit

In 2021, CMRL proposed an extension to the first phase to connect the Airport with Kilambakkam.[22] Detailed project report for the project was submitted by CMRL in 2022.[23] The As of October 2023, the project is awaiting funds.[24]

LineTerminalsLengthStationsStatus
Blue LineChennai AirportKilambakkam15.3 km (9.5 mi)12DPR prepared

Infrastructure

edit
Chennai metro coaches are manufactured by Alstom

The trains are operated on 1,435 mm (4 ft 8+12 in) standard gauge double-tracked lines.[25] The average speed of operation is 85 kilometres per hour (53 mph) and maximum speed is 120 kilometres per hour (75 mph).[26] Alstom supplies the rolling stock for the trains operated on the line.[27] The trains are air-conditioned with electrically operated automatic sliding doors and have a first-class compartment with a dedicated section reserved for women.[28]

The trains operate on 25 kV AC traction catenary system.[29] The trains are connected to the grid via overhead electric cables and are equipped with regenerative braking with a capacity to recover 30–35% of the energy during braking.[30] The electricity is supplied by Tamil Nadu Electricity Board.[31]

Network

edit
Platform screen doors installed in underground stations

A total of 26 stations are operational along the blue line with 13 underground stations. In the underground sections, a walkway runs along the length with cross passages every 250 metres (820 ft 3 in) for the maintenance and emergency evacuation.[32] The underground stations have an average width of 200 metres (656 ft 2 in) and average depth of 20 feet (6.1 m) from the ground level.[33] The length of the stations in Phase 1 extension is 180 metres (590 ft 7 in).[34][35] The elevated stations have three levels with the concourse level at a minimum height of 5.5 metres (18 ft 1 in) above the ground level and platform level above the concourse while the underground stations have two levels with platform screen doors.[36] The stations are air-conditioned and are equipped to be disabled and elderly friendly, with automatic fare collection system, announcement system, electronic display boards, escalators and lifts.[37] Paid parking facilities are available for two wheelers in most stations and four wheelers in select stations.[38]

The line connects the northeast and the southwest ends of the city. The stations include:

Blue Line
S.NoStation NameConnectionsInter Corridor ConnectionStation LayoutPlatform Level TypeOpened
EnglishTamil
1Wimco Nagar Depotவிம்கோ நகர் பணிமனைNoneNoElevatedSide13 March 2022[39]
2Wimco Nagarவிம்கோ நகர் Wimco Nagar railway stationNoElevatedSide14 February 2021
3Tiruvottriyurதிருவொற்றியூர் Bus TerminusNoElevatedSide14 February 2021
4Tiruvottriyur Theradiதிருவொற்றியூர் தேரடிNoneNoElevatedSide13 March 2022[40]
5Kaladipetகாலடிப்பேட்டைNoneNoElevatedSide14 February 2021
6Tollgateசுங்கச்சாவடி Bus TerminusNoElevatedSide14 February 2021
7New Washermanpetபுது வண்ணரப்பேட்டைNoneNoElevatedSide14 February 2021
8Tondiarpetதண்டையார்பேட்டைNoneNoUndergroundIsland14 February 2021
9Sir Theagaraya Collegeசர் தியாகராயா கல்லூரிNoneNoUndergroundIsland14 February 2021
10Washermanpetவண்ணாரப்பேட்டை Washermanpet railway stationNoUndergroundIsland10 February 2019
11Mannadiமண்ணடிNoneNoUndergroundIsland10 February 2019
12High Courtஉயர் நீதிமன்றம் Bus TerminusNoUndergroundIsland10 February 2019
13Puratchi Thalaivar Dr. M.G. Ramachandran Centralபுரட்சித் தலைவர் டாக்டர். எம்.ஜி. இராமச்சந்திரன் சென்ட்ரல்  Green Line, Chennai Central Railway Station, Chennai Park Suburban, Chennai Park Town MRTS, Chennai Moore Market SuburbanYesUndergroundIsland25 May 2018, 10 February 2019
14Government Estateஅரசினர் தோட்டம்NoneNoUndergroundIsland10 February 2019
15LICஎல்.ஐ.சிNoneNoUndergroundIsland10 February 2019
16Thousand Lightsஆயிரம் விளக்கு  Purple LineNoUndergroundIsland10 February 2019
17AG – DMSஏ.ஜி. – டி.எம்.எஸ்.NoneNoUndergroundIsland25 May 2018
18Teynampetதேனாம்பேட்டைNoneNoUndergroundIsland25 May 2018
19Nandanamநந்தனம்  Orange LineNoUndergroundIsland25 May 2018
20Saidapetசைதாப்பேட்டைNoneNoUndergroundIsland25 May 2018
21Little Mountசின்னமலைNoneNoElevatedSide21 September 2016
22Guindyகிண்டி Guindy railway station, Bus TerminusNoElevatedSide21 September 2016
23Arignar Anna Alandurஅறிஞர் அண்ணா ஆலந்தூர்  Green Line,   Red LineYesElevatedSide29 June 2015, 21 September 2016
24Nanganallur Roadநங்கநல்லூர் சாலைNoneYesElevatedSide21 September 2016
25Meenambakkamமீனம்பாக்கம் Meenambakkam railway stationYesElevatedSide21 September 2016
26Chennai International Airportசென்னை பன்னாட்டு விமான நிலையம் Tirusulam railway station, Chennai International AirportYesElevatedSide21 September 2016
Extension - During Phase 2
27Pallavaramபல்லாவரம் Pallavaram Railway Station, Bus TerminusN/AElevatedSideTBA
28Kothandam Nagarகோதண்டம் நகர்NoneN/AElevatedSideTBA
29Chromepetகுரோம்பேட்டை Chromepet railway stationN/AElevatedSideTBA
30Mahalakshmi Colonyமகாலட்சுமி காலிணிNoneN/AElevatedSideTBA
31Thiru.Vi.Ka Nagarதிரு.வி.க நகர்NoneN/AElevatedSideTBA
32Tambaramதாம்பரம் Tambaram railway stationN/AElevatedSideTBA
33Irumbuliyurஇரும்புலியூர்NoneN/AElevatedSideTBA
34Peerkankaranaiபீர்க்கன்கரணைNoneN/AElevatedSideTBA
35Perungalathurபெருங்களத்தூர் Perungalathur railway stationN/AElevatedSideTBA
36Vandalurவண்டலூர் Vandalur railway stationN/AElevatedSideTBA
37Arignar Anna Zoological Parkஅறிஞர் அண்ணா உயிரியல் பூங்காNoneN/AElevatedSideTBA
38Kilambakkamகிளாம்பாக்கம் Bus Terminus, Kilambakkam railway stationN/AElevatedSideTBA

Inter-Corridor Line

edit

The line connects Chennai Central with Chennai International Airport. The stations include :

Inter Corridor Line
S.NoStation NameConnectionsLayoutOpened
EnglishTamil
1Puratchi Thalaivar Dr. M.G. Ramachandran Centralபுரட்சித் தலைவர் டாக்டர். எம்.ஜி. இராமச்சந்திரன் சென்ட்ரல் Chennai Central Railway Station, Chennai Park Suburban, Chennai Park Town MRTS, Chennai Moore Market SuburbanUnderground10 February 2019
2Government Estateஅரசினர் தோட்டம்Underground10 February 2019
3LICஎல்.ஐ.சிUnderground10 February 2019
4Thousand Lightsஆயிரம் விளக்கு  Purple LineUnderground10 February 2019
5AG – DMSஏ.ஜி. – டி.எம்.எஸ்.Underground25 May 2018
6Teynampetதேனாம்பேட்டைUnderground25 May 2018
7Nandanamநந்தனம்  Orange LineUnderground25 May 2018
8Saidapetசைதாப்பேட்டைUnderground25 May 2018
9Little Mountசின்னமலைElevated21 September 2016
10Guindyகிண்டி Chennai Suburban RailwaysElevated21 September 2016
11Arignar Anna Alandurஅறிஞர் அண்ணா ஆலந்தூர்  Red LineElevated29 June 2015
12Nanganallur Roadநங்கநல்லூர் சாலைElevated21 September 2016
13Meenambakkamமீனம்பாக்கம் Chennai Suburban RailwaysElevated21 September 2016
14Chennai International Airportசென்னை பன்னாட்டு விமான நிலையம் Chennai Suburban Railways Chennai International AirportElevated21 September 2016
15Pallavaramபல்லாவரம்ElevatedTBA
16Kothandam Nagarகோதண்டம் நகர்ElevatedTBA
17Chromepetகுரோம்பேட்டைElevatedTBA
18Mahalakshmi Colonyமகாலட்சுமி காலிணிElevatedTBA
19Thiru.Vi.Ka Nagarதிரு.வி.க நகர்ElevatedTBA
20Tambaramதாம்பரம்ElevatedTBA
21Irumbuliyurஇரும்புலியூர்ElevatedTBA
22Peerkankaranaiபீர்க்கன்கரணைElevatedTBA
23Perungalathurபெருங்களத்தூர்ElevatedTBA
24Vandalurவண்டலூர்ElevatedTBA
25Arignar Anna Zoological Parkஅறிஞர் அண்ணா உயிரியல் பூங்காElevatedTBA
26Kilambakkamகிளாம்பாக்கம் Bus TerminusElevatedTBA

Renamed Stations

edit
Blue Line
S.NoOld Station NameLayoutConnectionsNew Station Name
EnglishTamilEnglishTamil
1Gowri Ashramகௌரி ஆசிரமம்ElevatedNoneTiruvottriyur Theradiதிருவொற்றியூர் தேரடி
2Thangalதாங்கல்ElevatedNoneKaladipetகாலடிப்பேட்டை
3Tondiarpetதண்டையார்பேட்டைElevatedNoneNew Washermanpetபுது வண்ணரப்பேட்டை
4Korukkupetகொரூக்குப்பேட்டைUndergroundNoneTondiarpetதண்டையார்பேட்டை
5Chennai Centralசென்ட்ரல்Underground  Green Line, Chennai Central Railway Station, Chennai Park Suburban, Chennai Park Town MRTS, Chennai Moore Market SuburbanPuratchi Thalaivar Dr. M.G. Ramachandran Centralபுரட்சி தலைவர் டாக்டர் எம்.ஜி.ஆர் சென்ட்ரல்
6Alandurஆலந்தூர்Elevated  Green Line,   Red LineArignar Anna Alandurஅறிஞர் அண்ணா ஆலந்தூர்
7Chennai International Airportசென்னை பன்னாட்டு விமான நிலையம்Elevated Tirusulam railway station, Chennai International AirportNLC India Airportஎன்.எல்.சி இந்தியா விமான நிலையம்

See also

edit

References

edit
  1. ^ "Metro is a financial success, not just a technological one". Livemint. 11 September 2007. Archived from the original on 13 November 2019. Retrieved 13 November 2019.
  2. ^ a b c "Chennai Metro Rail Project approved by Government of India" (PDF) (Press release). Chennai Metro Rail Limited. 28 January 2009. Archived (PDF) from the original on 8 April 2023. Retrieved 1 December 2023.
  3. ^ a b "Chennai Metro Rail FAQ". Chennai Metro Rail Limited. Archived from the original on 27 February 2018. Retrieved 16 February 2018.
  4. ^ "Center nod for Metro Rail in Chennai". The Times of India. 16 April 2008. Archived from the original on 25 June 2008. Retrieved 20 August 2010.
  5. ^ "Work commences on Chennai Metro". Projects Today. 11 June 2009. Archived from the original on 25 August 2017. Retrieved 16 August 2010.
  6. ^ "Alstom to provide 2000 cars for Chennai's metro". The Financial Express. 11 September 2010. Archived from the original on 29 January 2023. Retrieved 18 September 2010.
  7. ^ "First Metro Rolling Stock contract in India" (Press release). Alstom Transport. 9 September 2010. Archived from the original on 15 April 2023. Retrieved 18 September 2010.
  8. ^ Ramakrishnan, T. (6 November 2013). "Chennai Metro Rail Test Run". The Hindu. Archived from the original on 10 November 2013. Retrieved 6 November 2013.
  9. ^ "Metro Rail Rolls Out a Surprise with Koyambedu-Pillar trial Run". New Indian Express. 14 February 2014. Archived from the original on 15 September 2014. Retrieved 2 October 2014.
  10. ^ "Chennai Metro holds trial on elevated section". Business Line. 14 February 2014. Archived from the original on 22 February 2014. Retrieved 2 October 2014.
  11. ^ "Chennai Metro one stop short of dream run". Deccan Chronicle. 31 August 2014. Archived from the original on 4 March 2016. Retrieved 6 June 2016.
  12. ^ "Conditional clearance for Metro Rail". The Hindu. 28 April 2015. Archived from the original on 14 January 2016. Retrieved 7 June 2016.
  13. ^ Chennai Metro Newsletter - August 2015 (PDF) (Report). Chennai Metro. 29 June 2015. Archived (PDF) from the original on 20 October 2023. Retrieved 7 June 2023.
  14. ^ Sekar, Sunitha (14 May 2017). "Naidu, Palaniswami flag off underground stretch of Chennai Metro". The Hindu. ISSN 0971-751X. Archived from the original on 26 February 2020. Retrieved 29 January 2019.
  15. ^ Sekar, Sunitha (25 May 2018). "Chennai Metro Rail opens two underground stretches". The Hindu. ISSN 0971-751X. Archived from the original on 27 February 2020. Retrieved 29 January 2019.
  16. ^ Simhan, TE Raja (10 February 2019). "PM Modi inaugurates Chennai Metro Rail's final leg". The Hindu Businessline. Archived from the original on 26 October 2020. Retrieved 13 February 2019.
  17. ^ "Track work in Metro phase 1 extension to begin soon". The Hindu. 6 December 2018. Archived from the original on 26 February 2020. Retrieved 6 November 2019.
  18. ^ "First set of trains for Chennai metro phase 1 extension flagged-off". Business Line. 19 October 2019. Archived from the original on 5 November 2019. Retrieved 6 November 2019.
  19. ^ "Opening of phase-1 Chennai metro extension stretch to be delayed?". The New Indian Express. Archived from the original on 9 January 2021. Retrieved 9 January 2021.
  20. ^ "Chennai: Trial run between Washermanpet and Wimco Nagar Metro stations successful, says CMRL". Indian Express. 26 December 2020. Archived from the original on 26 December 2020. Retrieved 26 December 2020.
  21. ^ "Project status of Chennai Metro". Chennai Metro Rail Limited. Archived from the original on 26 September 2016. Retrieved 16 August 2010.
  22. ^ "Work on 15-km Metro line from airport to Kilambakkam in Chennai suburbs may begin this year". The New Indian Express. 23 February 2021. Archived from the original on 25 April 2021. Retrieved 25 April 2021.
  23. ^ "Chennai Airport-Kilambakkam Metro project set to take off". The Hindu. 20 July 2022. ISSN 0971-751X. Archived from the original on 21 July 2022. Retrieved 21 July 2022.
  24. ^ "With no funds from Centre for phase II of Metro, Airport-Kilambakkam project unlikely to be taken up now". The Hindu. 3 October 2023. Archived from the original on 10 October 2023. Retrieved 1 December 2023.
  25. ^ Srinivasan, Meera (3 February 2013). "Countdown to Chennai Metro begins". The Hindu. Archived from the original on 5 February 2013. Retrieved 3 February 2013.
  26. ^ "Metro rail train zips over city roads". The Hindu. 6 June 2016. Archived from the original on 26 October 2023. Retrieved 1 December 2023.
  27. ^ "Alstom completes in Lapa plant the first train for Chennai metro, in India" (Press release). Alstom. May 2013. Archived from the original on 21 April 2016. Retrieved 6 June 2016.
  28. ^ Sekar, Sunitha (18 July 2014). "All aboard, Chennai Metro". The Hindu. Archived from the original on 15 February 2016. Retrieved 15 July 2018.
  29. ^ "Alstom to provide 168 cars for Chennai's metro for 243 million" (Press release). Alstom. 1 September 2010. Archived from the original on 15 April 2023. Retrieved 6 June 2023.
  30. ^ "First ride in a Chennai Metro train". The Hindu. Archived from the original on 14 January 2016. Retrieved 6 June 2016.
  31. ^ "Metro rail sets up units to power trains, stations to meet year-end deadline to start services". The Times of India. 15 April 2014. Archived from the original on 18 April 2014. Retrieved 18 April 2014.
  32. ^ Sekar, Sunitha (10 August 2014). "First underground Metro network by December 2015". The Hindu. Archived from the original on 15 February 2016. Retrieved 4 October 2014.
  33. ^ "Metro's underground frame" (PDF). Chennai Metro. 20 September 2013. Archived (PDF) from the original on 26 December 2023. Retrieved 1 December 2023.
  34. ^ "Metro Phase 1 extension tunneling nears completion". The Hindu. 25 September 2017. Archived from the original on 26 February 2020. Retrieved 29 September 2017.
  35. ^ "CMRL's compact stations have their own fan club". The Hindu. Chennai. 29 June 2018. Archived from the original on 30 January 2020. Retrieved 15 July 2018.
  36. ^ Chennai Metro Investment Project (PDF). Asian Development Bank (Report). Archived (PDF) from the original on 4 June 2023. Retrieved 30 August 2023.
  37. ^ Sekar, Sunitha (20 January 2014). "No clarity on access at Chennai Metro stations yet, say disabled". The Hindu. Archived from the original on 4 February 2014. Retrieved 6 June 2016.
  38. ^ Parking Facilities Availability 2018 (PDF) (Report). chennaimetrorail.org. Archived (PDF) from the original on 8 June 2019. Retrieved 16 August 2010.
  39. ^ Sekar, Sunitha (5 January 2022). "Metro Rail plans a station at Wimco Nagar depot". The Hindu. Chennai: Kasturi & Sons. Retrieved 15 January 2022.
  40. ^ "'CMRL likely to handle up to 3.5L daily commuters soon' | Chennai News - Times of India". The Times of India.