Download ArticleDownload Article

A giant ready-mix concrete truck driving up to your house can be intimidating, but it doesn't have to be if your site is prepared, you have all your tools at hand, and you've ordered the right amount. Dispatchers are quite helpful, but you should know the basics before you call so you don't wind up with more or less than you need.

  1. How.com.vn English: Step 1 Calculate the right volume.
    In the U.S. Concrete is always ordered in cubic yards. First figure out the cubic footage, then convert to yards by dividing by 27. Here's how: multiply the length of your project times the width times the depth (4 in. = . 33 ft.) and divide the total by 27. Using a sidewalk as an example: 60 feet (18.3 m). (long) x 4 feet (1.2 m). (wide) x .33 feet (0.1 m). (deep) = 79.2 cu. ft. ÷ 27 = 2.93 cu. yards.You can also figure your cubic yards by this example: length, times, width, divided by, 12, times, thickness, divided by, 27. using the figures from above example. 60 feet (18.3 m) ( length ), times 4 feet (1.2 m) (width), divided by 12, times 4 inches (10.2 cm) (thickness), divided by 27 = 2.96 cubic yards. Concrete is cheap and nothing is worse than coming up short (except rain). A good rule of thumb is to order an extra 5 percent rounded up to the next 14 yard (0.2 m). to handle spillage and uneven bases.[1]
  2. How.com.vn English: Step 2 Order from the nearest supplier.
    Get fresh concrete mixed near the site, not mixed across town by some company with a lower price.[2]
    Advertisement
  3. How.com.vn English: Step 3 Ask for 5 percent “air entrainment” in the mix.
    Suppliers add a chemical that traps microscopic air bubbles to help the concrete handle the expansion and shrinkage caused by climatic changes such as freezing.[3]
  4. How.com.vn English: Step 4 Get the right strength.
    Tell them you're pouring an exterior sidewalk and they'll recommend the correct “bag mix” (ratio of cement to gravel and sand). In cold climates, they'll probably suggest at least a 3,000-lb. mix. That means concrete that'll handle a 3,000-lb. load per square inch without failing.
  5. How.com.vn English: Step 5 Have your checkbook ready.
    You'll have to pay on delivery after the concrete's unloaded.
  6. Advertisement

Community Q&A

Search
Add New Question
  • Question
    How much concrete is needed for a driveway that is 16 x 16 feet by 4 inches deep?
    How.com.vn English: Community Answer
    Community Answer
    16'x16'x4"=3.16 cubic yards. Typically it will take more than you think, I would plan for 3.5 - 4 yard depending on your grading. Also many concrete companies will give you a surcharge if you order less than 4 yards.
  • Question
    How much concrete do I need for a12x12x4 inches driveway?
    How.com.vn English: Community Answer
    Community Answer
    Multiply those dimensions together and convert it to meters squared which directly converts to liters.
  • Question
    How much concrete is needed for a driveway that is 46 by 52 feet?
    How.com.vn English: Community Answer
    Community Answer
    This depends on how thick you want your driveway to be. The minimum thickness should be four inches. Multiply 46' (552") by 52' (624") by 4" and you get 29.5 cubic yards.
See more answers
Ask a Question
200 characters left
Include your email address to get a message when this question is answered.
Submit
      Advertisement

      Tips

      • See the external links below for more detailed instructions.
      • The truck comes with the concrete premixed with the correct water content. But the driver may send a little concrete down the chute and ask if you'd like more water added. Only add water that brings it to the desired slump you ordered, for example if it is a 5" Slump and you ordered a 6" and you have 4 yards (3.7 m) on, then you may add 4 gallons (15.1 L) of water and or 1 gallon (3.8 L) per yard to bring it to the ordered slump. All ready mix companies add a chemical to the concrete when batching, this allows the slump to change. "Just don't wet it up past the ordered slump, because it is not designed to have that much water for the ratio of chemicals added, this will decrease the P.S.I. dramatically and even cause cracking.
      Submit a Tip
      All tip submissions are carefully reviewed before being published
      Thanks for submitting a tip for review!
      Advertisement

      About This Article

      How.com.vn is a “wiki,” similar to Wikipedia, which means that many of our articles are co-written by multiple authors. To create this article, 15 people, some anonymous, worked to edit and improve it over time. This article has been viewed 234,249 times.
      320 votes - 87%
      Co-authors: 15
      Updated: August 10, 2021
      Views: 234,249
      Thanks to all authors for creating a page that has been read 234,249 times.

      Did this article help you?

      ⚠️ Disclaimer:

      Content from Wiki How English language website. Text is available under the Creative Commons Attribution-Share Alike License; additional terms may apply.
      Wiki How does not encourage the violation of any laws, and cannot be responsible for any violations of such laws, should you link to this domain, or use, reproduce, or republish the information contained herein.

      Notices:
      • - A few of these subjects are frequently censored by educational, governmental, corporate, parental and other filtering schemes.
      • - Some articles may contain names, images, artworks or descriptions of events that some cultures restrict access to
      • - Please note: Wiki How does not give you opinion about the law, or advice about medical. If you need specific advice (for example, medical, legal, financial or risk management), please seek a professional who is licensed or knowledgeable in that area.
      • - Readers should not judge the importance of topics based on their coverage on Wiki How, nor think a topic is important just because it is the subject of a Wiki article.

      Advertisement