Download Article
Your complete guide to outdoor and underwater tunnel building
Download Article

Things You Should Know

  • To use the cut-and-cover method, dig out a trench where you'd like your tunnel to be. Make your tunnel walls, lay them down, and cover the area back up again.
  • Dredge an underwater trench for submerged tunnels. Lay down tubes with walls thick enough to handle the water's pressure.
  • Or, set up a tunnel boring machine, which automatically digs and erects tunnel walls as it moves. Behind it, continue fastening tunnel supports as needed.
Part 1
Part 1 of 4:

Considerations

Download Article
  1. How.com.vn English: Step 1 Consider where the tunnel will be built.
    The proposed tunnel’s location will determine what tools and techniques are necessary to construct it and prepare it for its intended use. Tunnels can be divided into 3 types:
    • Soft-ground tunnels. These tunnels require support at the openings to keep the tunnel from collapsing. These tunnels are usually shallow and used for subways, water delivery, and wastewater removal systems.
    • Rock tunnels. Because they are excavated from solid rock, these tunnels require little added support or none at all. Train and car tunnels are usually of this variety.
    • Underwater tunnels. As the name indicates, these tunnels go under rivers, lakes, canals, and in the case of the “Chunnel,” straits such as the English Channel. These are the hardest tunnels to build, as water has to be kept away from the tunnel during and after construction.[1]
    • Building a tunnel under a city offers problems similar to an underwater tunnel, in that the ground around the tunnel tends to sag under the weight of the buildings above it. A knowledge of the area’s geology helps predict how much the ground will sag and suggests what methods can minimize the sagging.
  2. How.com.vn English: Step 2 Consider the tunnel’s path.
    A tunnel with a long, single, straight path is comparatively easy to bore with a tunnel boring machine. Tunnels that differ from this design offer problems that make constructing them more complex.
    • Short tunnels aren’t bored with tunnel boring machines because it isn’t cost-efficient to do so.
    • Tunnels that require different bore diameters at different parts of their routes also make the use of a tunnel boring machine impractical because of delays in adjusting the bore diameter.
    • Tunnels that turn sharp corners or have intersecting shafts also make use of a boring machine impractical.
    Advertisement
  3. How.com.vn English: Step 3 Consider the tunnel’s purpose.
    What the tunnel will be used for determines what additional work besides making the tunnel itself will be necessary before putting it into service.
    • Tunnels that carry passengers require some form of ventilation. For roadway tunnels, this usually means ventilation shafts to prevent buildup of carbon monoxide. For railway tunnels, this can mean forced-air ventilation to remove diesel engine exhaust. Both feature supplemental methods to deal with the smoke created should a fire break out in the tunnel.
    • Heavily-used tunnels, such as the Big Dig in Boston, may feature continuously manned operations centers with video equipment to monitor traffic within the tunnel and deal with emergencies.
    • Long roadway tunnels, such as the Eisenhower Tunnel in Colorado, may be lit with overhead lights for the convenience of drivers and passengers. Other roadway tunnels, such as those in Zion National Park in Utah, may feature scenic cutouts to allow natural light to enter the tunnel in places and provide passengers glimpses of the surrounding scenery.
    • Some tunnels, such as the Queensway Tunnel between Liverpool and Birkenhead, England and the Lion Rock Tunnel between Sha Tin and New Kowloon in Hong Kong, combine an upper passenger traffic deck with a lower service deck for water, pipes, or cables. Other tunnels, such as Malaysia’s SMART Tunnel can be used for either traffic or flood control.[2]
  4. Advertisement
Part 2
Part 2 of 4:

Cut-and-Cover Method

Download Article
  1. How.com.vn English: Step 1 Dig a trench.
    The area where the tunnel will be is dug out completely, with the tunnel roof to be created and covered over when the tunnel is completed. This type of tunnel is constructed in one of two ways:
    • Bottom-up: Ground support is created first, then the tunnel is built up around it.
    • Top-down: The tunnel’s sides and roof are constructed at ground level, and the tunnel trench is dug out under it.
    • Both methods are used primarily for shallower tunnels, although the top-down method allows for digging deeper tunnels than the bottom-up method. Deeper tunnels are often excavated with the assistance of a tunneling shield, a box-like structure with small shutters opened to dig through. Once the dirt in front of the shield is removed, the shield is moved forward to continue digging.[3]
  2. How.com.vn English: Step 2 Create the tunnel walls and roof.
    The tunnel walls and roof can be built as the tunnel is being dug or may be pre-constructed and put into place as the tunnel is being dug. Materials today include the following:
    • Corrugated steel arches.
    • Precast concrete arches.
    • Precast concrete walls.
    • Poured or sprayed concrete. Often, this is used in conjunction with one of the formed-arch methods.
  3. How.com.vn English: Step 3 Complete the tunnel.
    How this is done depends on whether the bottom-up or top-down method was used.
    • Tunnels created with the bottom-up method must be back-filled to cover over the tunnel roof and any surface that is to exist above the tunnel roof is then built or rebuilt.
    • Tunnels created with the top-down method are dug out below where the tunnel walls and roof were erected, and then a base slab, which serves as the tunnel floor, is created.[4]
  4. Advertisement
Part 3
Part 3 of 4:

Immersed Tubes

Download Article
  1. How.com.vn English: Step 1 Dredge a trench when the tunnel will go.
    This method is similar to the cut-and-cover method, but is used for digging underwater tunnels. The trench needs to run the length the tunnel will run underwater.
  2. How.com.vn English: Step 2 Lay a series of steel tubes along the length of the trench.
    Each tube is sealed at either end with a bulkhead. If the tube is for a car tunnel, as in the case of the Ted Williams Tunnel in Boston, the tubes include pre-built road sections.
  3. How.com.vn English: Step 3 Encase the tube with enough backfill to withstand the water pressure above it.
    For the Ted Williams Tunnel, this was a 5-foot-thick (1.5 m-thick) layer of rock.
  4. How.com.vn English: Step 4 Connect the tubes by removing the intervening bulkheads.
    Any road or rail segments built into the tubes would be connected at this time as well.[5]
  5. Advertisement
Part 4
Part 4 of 4:

Tunnel Boring Machines

Download Article
  1. How.com.vn English: Step 1 Choose the right tunneling machine for the job.
    Tunnel boring machines, called TBMs for short or “moles,” feature circular plates on the front called shields. Disc-shaped cutters on the shield tear through rock and dirt, which passes through openings in the shield onto a conveyor belt inside the TBM that deposit it behind the machine.
    • The types of TBM shields vary according to whether the mole is to dig into soft, wet ground or hard rock. Shield diameters range from Aker Wirth’s 26.3-foot (8.03 m) shield on its TBM used for Switzerland’s Linth-Limmern power stations to Hitachi Zosen’s “Big Bertha,” with its diameter of 57.5 feet (17.5 m).[6]
    • Moles designed to dig tunnels below the water table also feature chambers at the front to pressurize the ground being dug through.
    • For large jobs, multiple TBMs may be called for. The Channel Tunnel required 11.[7]
  2. How.com.vn English: Step 2 Get the machine into position.
    For a surface level tunnel, this is no problem. If the tunnel is to be bored deep underground, an access shaft, usually circular, is drilled and lined with concrete. The TBM is lowered into it, and the tunnel is excavated from that point.
    • For long tunnels, multiple access shafts are drilled.
    • When the tunnel is finished, the access shafts may become ventilation shafts and/or emergency exits. If they are not so employed, they are left in place for the life of the tunnel. [8]
  3. How.com.vn English: Step 3 Erect tunnel supports as the machine bores through.
    Segments of pre-cast concrete are erected behind the TBM to form a ring at pre-determined intervals.[9]
  4. How.com.vn English: Step 4 Spray concrete on the excavated walls between the support rings.
    The sprayed concrete, or shotcrete, coats and stabilizes the tunnel walls. The shotcrete may include steel or polypropylene fibers to strengthen it, much the way steel rebar is used to strengthen cast concrete. [10] The shotcrete also contains an accelerant to help it stick to the tunnel walls and dry quickly.[11]
  5. Advertisement


Community Q&A

Search
Add New Question
  • Question
    Is it possible to build a small one from my house to a neighbor's house? My kids want one, but I am on a budget.
    How.com.vn English: Community Answer
    Community Answer
    It would be possible, but very difficult if you were planning to do it underground. What I would recommend is building a tunnel between your backyards by cutting a hole in the fence, or maybe digging a small one under the fence.
  • Question
    How long does it take to build a 500m tunnel?
    How.com.vn English: Community Answer
    Community Answer
    The Chunnel (between England and France) was built at a rate of 12 cm (5 inches) per hour. Based on that, one could excavate roughly 3 meters in a 24-hour period. A 500-meter tunnel could conceivably be constructed in 4,167 hours. Working 24 hours a day, it would take you 174 days to complete your tunnel. This is just under half a year, or 5.8 months. Working 10 hours per day, it would take you 417 days, or 14 months. And working only 8 hours per day it would take about 520 days or 17 months. If this is a weekend project, it will take you years and years to do it.
  • Question
    How long does it take to build a tunnel?
    How.com.vn English: Community Answer
    Community Answer
    It depends on how hard you work, the tools you have, the length of the tunnel and the terrain you are building it through.
See more answers
Ask a Question
200 characters left
Include your email address to get a message when this question is answered.
Submit
      Advertisement

      Tips

      • Early tunnels were bored through rock by drilling holes and using explosives: first black powder and later dynamite. Temporary supports of wooden frames would be erected, replaced by brick and masonry. Later tunnels used segmented cast iron rings, bolted together, in place of the wood and masonry.[12]
      • Tunnels can also be drilled through soft earth by using jacks to push either tubes/pipes or box-shaped excavators tipped with cutting heads. Pipe-jacked tunnels tend to be narrow, no more than 10.5 feet (3.2 m) in diameter, while box-jacked tunnels can be as wide as 65.6 feet (20 m).[13]
      Submit a Tip
      All tip submissions are carefully reviewed before being published
      Thanks for submitting a tip for review!
      Advertisement

      About This Article

      How.com.vn is a “wiki,” similar to Wikipedia, which means that many of our articles are co-written by multiple authors. To create this article, 14 people, some anonymous, worked to edit and improve it over time. This article has been viewed 139,822 times.
      59 votes - 74%
      Co-authors: 14
      Updated: July 11, 2023
      Views: 139,822
      Categories: Earthworks
      Article SummaryX

      If you want to build a tunnel, first you’ll have to figure out where the tunnel will be built, how long the tunnel will be, and whether it’ll be relatively straight, or if it’ll need to curve around. Then, you’ll have to dig a trench along the planned route of your tunnel, and build the floor, walls, and roof using materials like corrugated steel arches and poured concrete. Depending on the purpose of your tunnel, you’ll also need to add amenities like ventilation or overhead lighting. To learn how tunneling machines work, keep reading!

      Did this summary help you?

      Thanks to all authors for creating a page that has been read 139,822 times.

      Did this article help you?

      ⚠️ Disclaimer:

      Content from Wiki How English language website. Text is available under the Creative Commons Attribution-Share Alike License; additional terms may apply.
      Wiki How does not encourage the violation of any laws, and cannot be responsible for any violations of such laws, should you link to this domain, or use, reproduce, or republish the information contained herein.

      Notices:
      • - A few of these subjects are frequently censored by educational, governmental, corporate, parental and other filtering schemes.
      • - Some articles may contain names, images, artworks or descriptions of events that some cultures restrict access to
      • - Please note: Wiki How does not give you opinion about the law, or advice about medical. If you need specific advice (for example, medical, legal, financial or risk management), please seek a professional who is licensed or knowledgeable in that area.
      • - Readers should not judge the importance of topics based on their coverage on Wiki How, nor think a topic is important just because it is the subject of a Wiki article.

      Advertisement